Edit busbars, switches and shunts
Select equipment, check its operating state, then stage and review the edit. The single-line, inspector and schedules share the same native identities.
Inspect the operating state
Select a bus section, coupler, breaker, disconnector or shunt. Check its terminals, nominal voltage and source. Normal position is the declared usual arrangement; operating position determines the actual modeled connection. An open device and an out-of-service device are not interchangeable concepts.
Stage an edit
- Select the exact equipment in the drawing or schedule.
- Change its permitted state or parameter in the inspector. The proposed state is shown alongside the current state.
- For a fixed shunt, inspect G and B at 1 pu. Preserve the native sign convention; do not silently reverse capacitive and inductive declarations.
- Review connection and voltage errors, then publish the reviewed transaction once.
- Run a newly saved load-flow or admitted fault case to inspect the electrical consequences. Previous receipts remain historical.
Ratings and limitations
Current is kA; voltage is kV. A continuous current rating is not a certified breaking duty. Ideal closed-switch components may be reduced to one electrical node; individual currents inside an ideal loop can be indeterminate. An unavailable current must not be displayed as a successful zero.
Failure and recovery
Cancel changes nothing. Missing ratings remain explicit. A rejected or timed-out publication retains the draft and does not silently change terminals. Save and reopen the project to confirm state persistence. Earthing interlocks, automatic compensation and interruption-duty qualification require their own admitted models; a switch symbol alone does not supply them.
Related: Creation, Calculation settings, Recorded results.