Exact-result engineering verification

Kind

verification

Interpretation

Prerequisite: a retained candidate-owned balanced AC or admitted RMS receipt, its immutable source and complete hashed assets. In native Map choose Checks → Verify results; in Build use study_submit with kind=verification and target_receipt (SHA256), then poll study_status and read paged study_results/study_evidence. Plan may read existing audits only. The isolated worker audits terminal equations, nodal P/Q balance (0.0001 MVA), passive losses, source constraints and, for all admitted RMS samples, event parameters and normalized generator algebraic/backward-Euler defects (0.000001). Equation, source-limit, integrity and independent-reference verdicts are distinct. Schema-2 audits separately check geographic consistency (site/voltage-level membership, co-located transformer windings, route lengths, source-bound type/base and current-to-MVA conversion) and geographic provenance. Missing coverage is unavailable; synthetic consistency is never GIS or manufacturer attestation. Legacy schema-1 audits do not establish physical geography. The pinned independent AC comparison matches the initialization only, not transient dynamics. Read failures with equipment/group/worst sample time and actual/tolerance; unavailable, corrupt, incomplete and unsupported coverage never pass. Inspect checks filters findings and can show all rows. If a runtime is unavailable, restore the pinned reference environment and submit another audit; do not edit old receipts or relax limits. This append-only audit neither changes the model nor approves engineering/Apply. See Map verification for units, scope and recovery.

Core review and independent coverage

The native Review tab separates calculation, equation checks, independent reference and ratings/duty. Verify AC calculations explicitly submits a verification of the exact retained receipt, not a new AI task. The balanced-external-vd/1 profile admits one radial VD source, constant-PQ demand and supported neutral two-winding equipment. Its source injection is derived consistency evidence; source capacity remains unavailable without declared limits. The radial-neutral-2w-3ph/1 fault reference compares initial symmetrical current only for neutral fixed-ratio two-winding max/min three-phase cases; refer impedances and target currents on explicit voltage bases. Peak/thermal equipment duty requires separate sourced ratings. Missing or older quantities remain unavailable; disagreement is never averaged away. Changed candidates mark retained views Historical. Double-click findings to locate exact equipment; export the unchanged receipt and source references through Evidence. No manufacturer verification or engineering approval is implied.

Run

Discover settings with study definitions. Select an exact network snapshot and case version; inspect readiness. Submit once using study_submit or the case submission tool, monitor study_status, then inspect study_results. Keep input/configuration/solver identities, warnings and failure states.

Compare and accept

Use equivalent settings/units and exact receipts. Unsupported or incompatible inputs remain explicit. Numerical qualification and human acceptance are separate. See Studies.