Guide contents

Corrective AC dispatch

Kind

corrective-ac

Interpretation

Use typed study definitions/submission for this advanced method; registration does not imply a dedicated Study Manager form. Select explicit outages and generator/load movement bounds against the exact detached artifact. Required parameter provenance must be adjacent to that candidate and frozen into the receipt; a synthetic declaration is not a manufacturer attestation. The worker optimizes each selected outage separately and requires independently checked nonlinear AC feasibility. Inspect optimizer convergence, feasible voltages/flows, MW/MVAr movements, active bounds and independent residuals per outage. Islanded, infeasible or optimizer-unconverged outcomes remain non-passing. Do not call these separate corrective proposals joint/global SCOPF, a certified optimum or engineering approval. Revise the exact configuration explicitly before retrying.

Run

Discover settings with study definitions. Select an exact network snapshot and case version; inspect readiness. Submit once using study_submit or the case submission tool, monitor study_status, then inspect study_results. Keep input/configuration/solver identities, warnings and failure states.

Compare and accept

Use equivalent settings/units and exact receipts. Unsupported or incompatible inputs remain explicit. Numerical qualification and human acceptance are separate. See Studies.