Connected native planning

Open a document from the Project tree's Network model or Planning and assessment sections, or its Workspace menu/command-search entry. Opening one runs no AI or study. Choose the exact detached draft/scenario. Human editing is available in either AI mode on an unfrozen draft; AI writes still require Build. Original and engineering Apply are unchanged.

Save, publish and recover

Save inputs retains the declared definition, including missing facts, as versioned metadata in the native project. Publish native changes additionally validates and atomically changes the same native candidate. It is available only for network creation, switchgear, profiles and dispatch inputs. Review all units, connectivity and sources first; constructor defaults are not supplied facts.

Manual saves pause only this conversation, wait for its mutation to settle, then compare the exact artifact and record revision. Conflicts retain your form. Review saved head, then explicitly Use reviewed head as merge base to reconcile before saving again; no silent overwrite. Undo/redo uses this draft's transaction history. Unsaved forms survive navigation and are recovered without replaying mutations or AI. Discard is explicit. New record does not discard a pending one. Saved plan history in Notes is read-only; it does not execute a plan or infer approval.

Eight bounded workflows

  • Create network: declare substations, buses (kV and explicit slack state),

native generators, lines (pu, MVA) and loads (MW/MVAr). Optional bus substation accepts its exact ID or a distinct name. Three steps separate sites/buses, connections/demand and review/publication. Preview is illustrative, not an automatically authored native single-line diagram or template qualification.

  • Switchgear and shunts: native bus sections (kV, explicit slack state and

optional exact substation), endpoints, closed/active states, switch rated current in kA and fixed shunt G/B in MW/MVAr at 1 pu. Existing IDs are preserved. Leave an unknown current blank: topology may publish, but switch loading remains incomplete. Legacy branch MVA is not silently converted to current. This is not breaker manufacturer, interrupting-duty, interlock or protection qualification.

  • Equipment profiles: explicit offset timestamps, declared IANA time zone and

P/Q rows. A new axis requires every load/generator, including fixed values. Existing axes cannot silently resize. Generator P is scheduled; regulated Q remains the native AVR solution, not a scheduled Q curve. Missing values stay missing and prevent publication. Native storage is UTC; original declarations remain in metadata. No interpolation, annual energy or tariff is inferred.

  • Constrained dispatch: save/publish supplied generator bounds and quadratic

cost coefficients, declared currency and cost basis. Run uses the saved native snapshot/scenario, optional one fixed branch outage, native OPF and independent AC before/after checks. No hidden load shedding, implicit N-1, ramp scheduling, global-optimality or dispatch authorization claim.

  • Connection requests: declared existing bus, load or fixed P/Q generation.

Before/after balanced AC studies retain a separate proposal, never modify Original. Optional explicit connection profiles must match the complete existing native axis (up to 96 instants); all results remain in retained evidence. The overview displays the first pair; inspect evidence for the full profile.

  • Transfer screening: distinct active non-slack generators, explicit source

and sink weights summing to one, MW step/maximum and optional fixed outage. Up to 96 sampled points; stops on first failed check or generator bound. Last passing sample is not certified ATC/TTC or a continuous security margin.

  • Economic alternatives: declared currency, horizon, discount fraction, capital,

annual benefit/operating cost and per-alternative sources. Year-zero capital and constant year-end real-currency cash flows; NPV/simple payback do not establish electrical feasibility. No inflation, tax, energy, tariff or asset price inferred.

  • Engineering notes: sourced, versioned text beside a read-only saved-plan index.

Old source declarations remain historical when corrected, not support for a new value. No note or plan is engineering approval.

Creation and equipment-editor handoffs

Use Add source in equipment editor or Add transformer in equipment editor after saving/discarding pending creation rows. These open the existing checked equipment-creation form in the same detached scenario; no second engineering model is created. Supply the editor's required facts, or explicitly stage incomplete inputs instead. Returning to the creation/switchgear document refreshes the saved source while preserving an unsaved form. Review input readiness opens the same source's requirements. The topology preview is readable/zoomable and shows declared open/closed switches, sources, loads and shunts; its illustrative layout is not a saved native diagram or proof that a study passed.

Retained results and export

Run saved assessment explicitly creates an exact-source case. Cancel requests worker cancellation; no partial candidate is published. Historical results stay labelled when inputs change. Source identifiers are expandable, not a wall of hashes. The existing evidence-package export includes planning records, readable notes and retained numerical results; original documents require explicit selection. No new human approval proxy, inference or automatic continuation is introduced.

Current acceptance and remaining platform limits: spec 104 verification ledger.

Dispatch requires explicit native publication before Run; the receipt freezes declared currency/cost basis and rejects drift from those exact published generator inputs.