Engineering case study · AI infrastructure
More compute.
A different power-supply decision.
An illustrative AI campus grows from 60 to 100 MW. Normal operation is only half the question: what happens when one supply branch is lost?
Synthetic planning example · balanced AC · no real customer or engineering approval
The decision
Reinforce the supply—or limit the expansion?
Four AI halls share a 132/33 kV supply. Two 80 MVA transformers serve the existing campus. We retain the same 100 MW demand while comparing two larger transformers with a third incoming transformer.
- Existing facility demand
- 60 MW
- Expanded facility demand
- 100 MW
- Supply alternatives
- 2 × 125 or 3 × 80 MVA
- Independent numerical checks
- 58 operating states

The model
Separate IT demand from the whole facility.
48 → 80 MW of IT
Auxiliaries add an assumed 12 → 20 MW, giving 60 → 100 MW total. The assumed load power factor is 0.98 lagging. These are design-point inputs, not measured annual PUE or a forecast of GPU utilisation.
Explicit planning limits
0.95–1.05 pu bus voltage and 100% continuous MVA ratings. No emergency overload allowance, hidden load reduction or automatic load shedding is used to make an option pass.
The retained results
Compare the same demand, not different promises.
Normal operation and every active-branch outage are calculated separately. An outage count covers this model's branches—not generators, upstream independence or complete facility reliability.
| Configuration | Demand | Min. voltage: normal / outage | Normal max. loading | Worst outage loading | Outages within limits | Outage conclusion |
|---|---|---|---|---|---|---|
| Existing · 2 × 80 MVA | 60 MW | 0.9861 / 0.9693 pu | 38.7% | 78.7% | 13/13 | Within stated limits |
| Expanded · 2 × 80 MVA | 100 MW | 0.9751 / 0.9410 pu | 65.2% | 134.6% | 9/13 | Limits exceeded |
| Expanded · 2 × 125 MVA | 100 MW | 0.9840 / 0.9643 pu | 41.4% | 84.2% | 13/13 | Within stated limits |
| Expanded · 3 × 80 MVA | 100 MW | 0.9842 / 0.9750 pu | 43.2% | 65.2% | 15/15 | Within stated limits |
Continuous-rating comparison. Terminal flows and full-precision quantities are retained in the downloadable CSV/JSON and native study handovers.
What changes the decision?
The existing 100 MW configuration reaches 134.6% loading in its worst branch-outage state. The two-125 MVA alternative reaches 84.2%; the three-80 MVA alternative reaches 65.2%. The report checks voltage and every modeled outage before drawing a screening conclusion. Lower loading alone does not establish the least-cost or most reliable real design.

Reproduce the result
Open the inputs. Inspect the evidence.
- Open a configuration. Each native file is editable; its input register explains the synthetic parameters and unit conversions.
- Restore saved studies. Import its handover ZIP into a separate project to inspect the original settings and retained results.
- Compare the alternatives. Use the normal/outage CSV and the independent checks—not a screenshot alone—as the numerical evidence.
- Read the boundary. A shared utility equivalent is not proof of an independent upstream supply or uninterrupted service.
Engineering package · 3.7 MiB · Technical report PDF · Evidence and SHA-256
Use a compatible PowerSystem desktop. The package is an example, not an installer; current installer availability is unchanged.
What this study does not establish
No UPS/battery performance, transient AI-load response, harmonics, protection coordination, utility interconnection approval or complete availability claim. It does not calculate construction costs, carbon or water impact, or regional grid adequacy.
The IEA's Energy and AI report explains why the topic matters. Its global projections do not supply this campus's electrical parameters. All campus inputs and results remain explicitly synthetic.
A similar supply question?
Tell us the engineering question and relevant voltage level. Do not email confidential network files or credentials.
Discuss your use caseStart with the smaller five-bus example →