Engineering case study · AI infrastructure

More compute.
A different power-supply decision.

An illustrative AI campus grows from 60 to 100 MW. Normal operation is only half the question: what happens when one supply branch is lost?

Synthetic planning example · balanced AC · no real customer or engineering approval

The decision

Reinforce the supply—or limit the expansion?

Four AI halls share a 132/33 kV supply. Two 80 MVA transformers serve the existing campus. We retain the same 100 MW demand while comparing two larger transformers with a third incoming transformer.

Existing facility demand
60 MW
Expanded facility demand
100 MW
Supply alternatives
2 × 125 or 3 × 80 MVA
Independent numerical checks
58 operating states
Actual PowerSystem application showing the synthetic AI campus supply schematic
Actual native application · synthetic 60 MW configuration. Open the image for readable full resolution; the editable package contains all four configurations.

The model

Separate IT demand from the whole facility.

48 → 80 MW of IT

Auxiliaries add an assumed 12 → 20 MW, giving 60 → 100 MW total. The assumed load power factor is 0.98 lagging. These are design-point inputs, not measured annual PUE or a forecast of GPU utilisation.

Explicit planning limits

0.95–1.05 pu bus voltage and 100% continuous MVA ratings. No emergency overload allowance, hidden load reduction or automatic load shedding is used to make an option pass.

The retained results

Compare the same demand, not different promises.

Normal operation and every active-branch outage are calculated separately. An outage count covers this model's branches—not generators, upstream independence or complete facility reliability.

ConfigurationDemandMin. voltage: normal / outageNormal max. loadingWorst outage loadingOutages within limitsOutage conclusion
Existing · 2 × 80 MVA60 MW0.9861 / 0.9693 pu38.7%78.7%13/13Within stated limits
Expanded · 2 × 80 MVA100 MW0.9751 / 0.9410 pu65.2%134.6%9/13Limits exceeded
Expanded · 2 × 125 MVA100 MW0.9840 / 0.9643 pu41.4%84.2%13/13Within stated limits
Expanded · 3 × 80 MVA100 MW0.9842 / 0.9750 pu43.2%65.2%15/15Within stated limits

Continuous-rating comparison. Terminal flows and full-precision quantities are retained in the downloadable CSV/JSON and native study handovers.

What changes the decision?

The existing 100 MW configuration reaches 134.6% loading in its worst branch-outage state. The two-125 MVA alternative reaches 84.2%; the three-80 MVA alternative reaches 65.2%. The report checks voltage and every modeled outage before drawing a screening conclusion. Lower loading alone does not establish the least-cost or most reliable real design.

Actual retained PowerSystem results for the synthetic 100 MW expansion and its branch outages
Actual retained native results for the existing-supply expansion. Calculation completion and engineering acceptance remain separate.

Reproduce the result

Open the inputs. Inspect the evidence.

  1. Open a configuration. Each native file is editable; its input register explains the synthetic parameters and unit conversions.
  2. Restore saved studies. Import its handover ZIP into a separate project to inspect the original settings and retained results.
  3. Compare the alternatives. Use the normal/outage CSV and the independent checks—not a screenshot alone—as the numerical evidence.
  4. Read the boundary. A shared utility equivalent is not proof of an independent upstream supply or uninterrupted service.

Engineering package · 3.7 MiB · Technical report PDF · Evidence and SHA-256

Use a compatible PowerSystem desktop. The package is an example, not an installer; current installer availability is unchanged.

What this study does not establish

No UPS/battery performance, transient AI-load response, harmonics, protection coordination, utility interconnection approval or complete availability claim. It does not calculate construction costs, carbon or water impact, or regional grid adequacy.

The IEA's Energy and AI report explains why the topic matters. Its global projections do not supply this campus's electrical parameters. All campus inputs and results remain explicitly synthetic.